living / dining area with joint

screed at the entrance
time for Christmas, came yesterday to the floating floor and was now filled. First in the floor, then on the ground and finally in the basement. Between the rooms were each placed a joint. Just as in a joint living / dining area in the extension of the wall between WT and hallway.
Now is the first house to about five days, so the floor can dry properly. Following is then a special heating protocol driven. After about two to three weeks, the surface of the floor will open with a grinding machine so that moisture can escape better.