Monday, November 30, 2009

Slogans On Eat Healthy Be Healthy

Latest pictures

I've noticed in recent releases that with the pictures not insert any folded the way I me introduce myself, I now put the images separately:



View from the west with kitchen, dining room and living room area downstairs and bedroom, children's and Tim's room upstairs ( from left to right)




view from the north with a guest bathroom, entrance and kitchen downstairs and the bathroom on the floor (from left to right)

Friday, November 6, 2009

How Does A Fridge Thermostat Capillary Work

The roof is covered!


After over two weeks idle phase has now been completed today, the roof covered. We have decided to Frankfurt pans - gray suit to the windows. We are really happy that we had received in this regard by the community Wendelstein no difficulties. A red roof, we did not want to!

The guys from Melnek (roofing) have also done great work - looks great!

Last week, the electrician, Mr. Schwarz from Altdorf, on site and has the switch
and cans located. He will probably start next
week to beat the slots.

And at 17.11. are then well finally installed the windows. Because the gray exterior color, there was a prolonged waiting time during production. Well - the plan could have been much better ...

is followed then the first Sanitärrohinstallation.

What Is A N.u.d.audible Alarm

bad timing


Sorry it took me a while to come, the roof to seal the roof. As well, the communication between site managers and contractors has not quite fit. Well - just after the topping has still been raining and snowing really. The result you see in the picture. I spent about two hours with "Keue" so to get the basement dry. We turned the water from the floor via the stairwell to the basement and then have buckets and two beers to the cellar (about 10 cm water level) returned to dry.