Tuesday, February 23, 2010

Find On-road Price For Cars In Bangalore

The kitchen is here!



We have a kitchen! Yesterday, the guys have built up from our kitchen XXXLutz in 14 hours. Same time, our stainless steel chimney was installed at the house. Next week, then the furnace (hare Thula) delivered.

Today we have Tim's birthday celebrated in the new house. The move comes closer. Webware Weekend, the time has come!

Wednesday, February 17, 2010

Pictur Of Eating Veginas

We have interior doors



entrance with guest bathroom



hallway upstairs

Friday, February 12, 2010

Does Dummy Help With Reflux

pics: tile, laminate and other ...



South view - entrance is on the back



Elternbad: almost done ...



Tim's Bad: almost ready ...



living room and construction dust sucker :-)



living room with window to the stairwell



View from living / dining area in the kitchen



laminate flooring in the guest room (now relocated)



our heat pump

Monday, February 1, 2010

Error 22 Pacemaster Pro

pics: drywall, tiles and stair



insulation in the floor, followed by drywall ceiling



corridor on the floor with drywall ceiling



Trockenbauverkofferung the supply lines in the EC



tiles in the EC



our stairs to our small gallery

Kidney Hospital China

From drywall up stairs!

Hi, I'm back. Now that I have not written anything for so long about our site, I will publish today all the more.

First, I wish all readers a happy new year!

After we brought the Christmas holiday rather lush behind us, we went to five days in Ansbach on the way home past the house and found with horror that the window at Tim's children is wide open. And the heater is running - great! Our future neighbor told me then that the window is open for five days. Investigations have shown that the screed Bauer had drawn the window from the outside and then had attached to the frame. The workers then have the scaffolding company in the degradation of the scaffold settled ignoranterweise the rope easily and if anyone know. Thank God, the screed taken no harm. However, in the said days, the already high cost of heating power (mobile heater to the circuit connected to the floor) still increased.

Just before Christmas I had agreed with the supervisor that the site should be cleaned up. This should have been handled by civil contractors. Lay everywhere around construction debris and waste residues. In the end, the developer has even cleaned up the site!

on 04/01/2010 I then started with my father, the drainage pipes that run in the basement at knee height, clad in drywall. The rest of the drywall night we can have any tiles from our tilers. I can recommend this work because it made it ugly pipes are covered and you have a nice rack.

on 07/01/2010 I got myself hired a grinding machine to grind the surface over the screed. On the surface formed during the curing of a so-called Sinderschicht, which must be opened to allow the tile adhesive to better connect with the screed. This work, I will not forget! It is similar to riding a rodeo animals - fortunately I quilting adventure at that time Mr. Seidl, plasterers from Thann castle, in the house who gave me the cellar plastered interior walls. He had experience with such a monster and I was admitted to the secret of grinding. High praise even for the good Verputzerarbeit!

on 11/01/2010 then the boys came from the dry (carpentry Gürtler from Thuringia, under the leadership of Mr. Rosenek) and have the roof sealed. Since the house was like a lot warmer! Feels Like 30 degrees. To work almost too warm. The drywall had been the way to advance a week earlier - why have they not done that, written in the stars. However, the guys have really done a top job! We

in the meantime had some difficulties in the form that has hobbled the coordination of individual trades by the construction manager something. A detailed mail and a clarifying phone call with the MD of Deura, Mr Lüttkopf has solved this problem then. Mr. Lüttkopf and staff from the Office Deura have flat out and causes a very short time all that is necessary. Great praise and thanks. Now it works again.

The missing windows have now been installed as well.

on 21.01.2010 was then carried out by Mr. Lüttkopf the blower-door test. Here, the house is checked for leaks. By over-and under pressure. We had a value of 1.1 and 1.3 and that although some points on the house are not baufortschrittbedingt tight - great result. As for my opinion about the artisans only confirmed - great job!

From 24.01. I then started with the priming of the walls. Oh yes - we have had to make an offer of a painter times. House underline including materials and labor: 5300 €. Since the decision was clear to me and my volunteers. I've already bought the material - about 500 € including primer, paint and painting tool.

From 25.01. Lorenz, the tiles from the company bucks, Burgoberbach started to tile our bathrooms. The man is an artist. Great work in short time. The contact we have of my father, who has not so long ago that the bathroom tiles can be new. As we look at the work. It's always good when you can get an idea beforehand of the quality.

Am 27.01. were the dry farmer then with their work (ceilings on upper and panellings in the bathrooms, on the ground and in the hobby room) ready and we could cancel. Thanks Peter! Thanks for your help Astrid priming.

Today, at 01.02. Mr. Bauer was proud of the steps from trendy stairs from Nordhausen and NiO has the stairs - he will be ready tomorrow. High praise - the company has met our desired color exactly. Moreover, the Lorenz Work included in the EC.

Fight At Party Cove Lake Of The Ozarks

visit Marchand SA




Marchand Doors - Your solution
Fire, burglary, noise and distortion
produces more than five decades Marchand SA custom door system elements. And this high-quality and perfection.
quality and flexibility is a priority for us

door factory JP Marchand SA
















Error At Line 1: Ora-00911: Invalid Character

Escape door widths


door widths
The usable width doors on escape routes, according
to measure the potential persons (see
VKF-fire policy "escape and rescue routes").
The room with the greatest persons
determines the required width. The minimum usable
Width is 900 mm. Depending on the persons
the width is extended to a multiple of 600 mm
, that is 1200 mm, 1800 mm or 2400 mm.
For double-leaf doors, the leaf only have
escape properties if the pedestrian gate
the required effective width does not have.
width = 900 mm max. 50 people!

Hospital After Cervical Polyp Removal

fire resistant VKF EI30 / T30


fire resistant VKF - Classification: The fire behavior of components is particularly characterized by their fire resistance. It is the minimum number of minutes during which a member of the questions to him Requirements be met.
Classification by VKF-Test standard: components are the classes F, T, R, K, S, A assigned and marked according to the duration of their fire resistance.
F = raumabschliessende and supporting components F 30bb, 30, 60, 90, 120, 180, 240
T = Moving elements such as doors and gates T 30, 60, 90
R = dense smoke and flames Accounts R 30, 60
K = fire dampers K 30, 60, 90
S = bulkheads S 30, 60, 90
A = elevator shaft doors A 30, 60

fire resistant EN - Classification: The classification of components is the European standard EN 13501 - 2:2003 classification of construction products and building their fire. The European standardization classified components with the criteria: capacity (R), Integrity (E) and thermal conductivity / insulation (I): Fire Resistance: Fire, components according to their behavior, to assess in particular the length of their fire resistance.
main criteria (function):
R = carrying capacity (resistance)
E = Integrity (Etanchéité)
I = insulation (isolation)
additional criteria:
W = When the continuous radiation is assessed
M = If special mechanical effects into account
C = For For mobile fire doors that are self-closing
S = components with particular limitation of smoke permeability
A letter accompanying the statement time of eg 30, 60 or 90 minutes, and so is the fire resistance time of the component, for example, REI 60 , EI60-classified, E30.

Inspirational Breast Cancer

EU product standards harmonization fire doors

From January 2009, applies to Switzerland, a new linguistic regime in the area of fire safety regulations.
for B (old) Registration number (New) = number of the fire protection application VKF!
Read the newsletter of the Association Schweizereische Door Manufacturers