Thursday, December 17, 2009

Odyssey Buggies For Sale

Christmas break

So - the next few days resting a hand on the site. Just perfect for quiet time. Bauherrren, workmen and neighbors can look forward to Christmas.

At this point I would say that we are satisfied with the work done. In particular, the coordination of the service worked well - the house was plastered against frost finished and the floor is already in there.

Last week came the window manufacturer again to replace the wrong bars. In this context, the flaws have been examined to the frame. It has assured us that damage is removed and then no longer be seen. For this, the Holes with a wax type finish and burnished. Perfect!

Special credit also look at the plasterer from VL-plastering company who have really done a great job. Even our independent tile has praised their work. Similarly, great work was also part of the company WMS-house technology under the guidance of the Lord made Schlotzhauer. For the next few weeks we have a portable heater was provided free of charge. Only the resulting electricity costs we must bear.

Next week is still the staircase builders and takes the allowance as soon as the screed can be walked. Also next week is broken down the framework and our depth will be a farmer Mr. Schliep Part of the house near the land fill ever heard - all in the cold season and advanced - Top!

Musinex Dm And Rashes

The screed as a Christmas


living / dining area with joint


screed at the entrance

time for Christmas, came yesterday to the floating floor and was now filled. First in the floor, then on the ground and finally in the basement. Between the rooms were each placed a joint. Just as in a joint living / dining area in the extension of the wall between WT and hallway.

Now is the first house to about five days, so the floor can dry properly. Following is then a special heating protocol driven. After about two to three weeks, the surface of the floor will open with a grinding machine so that moisture can escape better.

Tuesday, December 15, 2009

Fight Cancer Inspirational Quotes

floor



was today installed the underfloor heating. A temporary heating system ensures that water now flows in the pipes with a temperature of about 20 degrees. This ensures that no frost damage occurs.

to the floor thus precludes any more. A heating protocol will make in the next five weeks that the flooring is best to dry out. Hopefully!

Sony Dvd Player Sr200p Avi

pics: plastering plastering and floor insulation and underfloor heating


hobby room: Supply and waste lines


kitchen


living / dining area: The lines disappear behind a dry wall. Here, we were all angry again. Actually, electrical conduits were left to lie on the red waste pipe so that the shaft is not too wide. Now we will tie up temporarily and we hope that the dry Bauer does a good job.


hallway and staircase with window to the living room


living room with a view of woman and car :-)

Messages To Write In Wedding Cards



Last week it was made of the interior plaster finish. In my opinion to be working. However, the plasterers have to do outdoors still some things that they should make already done: The base is not yet fully insulated, the exterior window sills of the light trench and the patio door missing and the basement windows are not yet rendered. Supposedly they are working simultaneously on three construction sites (one in Darmstadt!). Well - was probably only a matter of time before the time pressure is growing.

For now, the plumbing under the leadership of Mr. Schlotzhauer from WMS-Home technology in the house and prepare the floor. On Thursday then come to the floor. The floor should be the first time with a flow temperature are heated by 25 degrees, so there is no frost damage. At the moment we have mild temperatures below freezing - but still go to the greens. In the children's

we have now but decided to leave the bath place directly on the concrete and not, as planned by the Deura: on the floor - reason: We think it's nice if the tub is higher than 50 cm - and that is only if it is directly on the concrete. For this we needed an extra form (disclaimer) sign, with which the Deura hedges (possibly occurring water damage - but it is rubbish!).

Monday, November 30, 2009

Slogans On Eat Healthy Be Healthy

Latest pictures

I've noticed in recent releases that with the pictures not insert any folded the way I me introduce myself, I now put the images separately:



View from the west with kitchen, dining room and living room area downstairs and bedroom, children's and Tim's room upstairs ( from left to right)




view from the north with a guest bathroom, entrance and kitchen downstairs and the bathroom on the floor (from left to right)

Friday, November 6, 2009

How Does A Fridge Thermostat Capillary Work

The roof is covered!


After over two weeks idle phase has now been completed today, the roof covered. We have decided to Frankfurt pans - gray suit to the windows. We are really happy that we had received in this regard by the community Wendelstein no difficulties. A red roof, we did not want to!

The guys from Melnek (roofing) have also done great work - looks great!

Last week, the electrician, Mr. Schwarz from Altdorf, on site and has the switch
and cans located. He will probably start next
week to beat the slots.

And at 17.11. are then well finally installed the windows. Because the gray exterior color, there was a prolonged waiting time during production. Well - the plan could have been much better ...

is followed then the first Sanitärrohinstallation.

What Is A N.u.d.audible Alarm

bad timing


Sorry it took me a while to come, the roof to seal the roof. As well, the communication between site managers and contractors has not quite fit. Well - just after the topping has still been raining and snowing really. The result you see in the picture. I spent about two hours with "Keue" so to get the basement dry. We turned the water from the floor via the stairwell to the basement and then have buckets and two beers to the cellar (about 10 cm water level) returned to dry.

Thursday, October 15, 2009

Body Temperature Diagram

topping! Our


the Monday and on Tuesday I spent the roof beams and boards (roof) to be deleted.

from moisture, and then only with gray weather-proof paint (to match the windows).

I worked in the hall of the mountain in carpentry Kerschensteiner id Oberpfalz Bayern decent atmosphere with first Overall, it took me about 5 hours.

On the lower image shows a part of the
wood before painting.

I can recommend this work to make sense to save money. The color has cost about 100 € and you have to work (including a second coat on the house) about Expect 7-8 hours.

If I had the work carried out, I 800-900 € would have paid. So - even the owner!

were on Wednesday morning, the boys from the carpentry Kerschensteiner on the mat (site) and in a record time have addressed the roof. Working time: 1 day!

counter 3:30 we celebrated our little topping among the carpenters, the bricklayers and builders of the small family. To sausage rolls, meat loaf and Krombacher was the master carpenter Mr Kerschensteiner its target spell to protect the house from future threats. A very nice tradition.

Hormone For Transgender

OG


The shell is near the end - too bad - it was really nice, the guys at work to watch and see the house grow formally. The outside walls are already available and at the beginning of the week (12:10:09) the first inner walls have been set. A nice feeling to see how are the individual rooms. To run even I can not write anything further. Similar to the EC all iO


Monday, September 28, 2009

Avx 7300 Pioneer Wire Harness Diagram

We have water in the house! The EC shall

... and that's good!

came on Friday the boys of fresh water Zweckverband Schwarzach group and have the water supply down.

The Bauwasserleitung was conducted as a precautionary measure up to the house, now converted into a fresh water connection and waterproof (up to a pressure of 0.5 bar inside and outside) in our utility room (for all "non-builders": utility room) is installed.

Silver And Black Angel Of Death Wig

contours


Praise to the company Lupo - until now the boys are really fast and make my opinion a good job. I try every day on site to look over, both to document everything and of course up close to the house construction to be present.

Last Thursday, 09/17/2009, was taken up the screen where you can see the first walls of our EC. The bottom row was built in mortar. All other rows are glued. This is much faster and uses much less water.
result, the house can also dry out much faster.

far we've really lucky with the weather - always hot and no rain!

After the ground slowly taking shape, and we are running around in it ever comes to us from all real super small - but that's probably normal :-)
Schliep The company that makes our earth works, does a great job. The trench was compacted in layers (approximately every 50 cm) and several times per shift.

Putting Peroxide On Herpes

Drainage of the light wells and retaining walls


After our basement was finished to our satisfaction and the outer walls were sealed with perimeter insulation, are now the light wells and light well was connected to a drainage system. The light wells in the north were connected to slotted pipes, so that the rising ground water can penetrate and drain away the same. In the south, the Skylights directly KG pipes connected and then introduced into our cistern.


A little tip to all clients: In the entrance area and in the area of the proposed terrace I had my share of heavy concrete retaining walls, which rest on the raised ground and about 180 cm high. They are used to the front steps and the northern part of the terrace in the first few years with the fall compacted earth and I can continue to have no trouble with it. In the patio area only at the house, because the design later in the south on natural soil is not there and will sink. The tip I got from my father, his house built about 30 years and has even supported us in word and deed. Thank you!

Friday, September 18, 2009

Trípode Manfroto 344b

The cellar is!


on Thursday, was 17:09., Then delivered the ceiling. Mr. Schwarz from the electric company black out Altdorf has moved directly after the conduits for electrical installations. Then the exterior basement walls were filled with concrete and poured the ceiling.

Davicon Cnet Cn200 Pro

The WU-Keller


The next day, then came even the exterior basement walls (waterproof concrete) and were from Lupo professional installation. Joint panels were installed and the transitions with a sealant filled.

Monday, January 19, 2009

Spyderco Replacement Parts

MVV Energie dirt after German MBA industry

The UK market for waste incineration plants (MVA) will be the Mannheimer MVV Energie AG, a very big player. Therefore, MVV Umwelt, the waste industry from MVV, founded in the fall of 2008 in England, MVV Environment Ltd.. This may succeed in the project, the technology of the German Mechanical-Biological Treatment (MBT), an alternative to incineration, poorly spoken as a precaution. Holger Franke, head of development of MVV Environment, warned in the British service industry "letsrecycle" before the MBT process (English: Mechanical Biological Treatment, German: MBA).

Paul Carey, the new CEO of MVV Environment sets, one more. MBT in Germany is past ("MBT has been and gone in Germany").
http://www.letsrecycle.com/do/ecco.py/view_item?listid=37&listcatid=352&listitemid=10461

Hello Mr. Carey what kind of weed did you smoke?
Where the wind blows at Carey becomes clear when one nachschaut. Previously he was head of development at the MVA British Waste Recycling Group (WRG) in Northampton, in the possession of the English construction and infrastructure group FCC (Fomento de Construcciones y Contratas, SA) in Barcelona. Carey's WRG's former employer called MBT (MBT) at its website as a proven technology and is one of 12 built by the parent group FCC MBA. This compares with only five built MVA. That was probably not enough for Carey fire under the boiler.
http://www.wrg.co.uk/
http://www.fcc.es/fcc/corp/index_i.htm

To understand the message of the ignorant islanders Mannheim fire friends are so right , Franke is in the British magazine "Recycling & Waste World" more concrete. With respect to the While "innovative", but failed and costly process of thermal decomposition and pyrolysis of waste Franke says, the MBT process would still have to struggle with technical and economic difficulties. He speaks of "many cases".
http://209.85.129.132/search?q=cache:PSc9if0yj3wJ:www.recyclingwasteworld.co.uk/features/index.php 3FfID%% +% 3D429% 22 + Environment + 22MVV MBT & hl = en & ct = clnk & cd = 8 & gl = de
http://www.recyclingwasteworld.co.uk/

MVV manager Holger Franke is also implementing the present German MBA technique that is successfully exported, the almost forgotten because failed, Thermoselect process immediately, which was also accompanied by windy marketing.

Fie, Mr. Frank! With public conquered throwing dirt on domestic competition is not foreign markets. We hope that the MVV Manager carousel take you to a very high orbit.

addition, given the British MVV pretty bad advice. MVA projects on the island lead to much more violent protests as MBA projects.

fact that when compared to the incineration technology of the young German MBT plants came to setbacks is not disputed. We have also been documented in detail and hopefully convincing constructive.

instead a long list of serious incidents in the German waste incineration plants present, let's take a look at MVV.
http://www.mvv-energie-ag.de/

MVV GmbH is a local utility company based in Mannheim.
The Mannheim Supply and Transport Company Ltd. in 1998 was renamed in MVV GmbH with its subsidiaries, MVV Energie AG (formerly Stadtwerke Mannheim AG, SMA) and MVV Verkehr AG (former Mannheimer Verkehrs-AG, MVG). Owner of MVV GmbH is 100% the city of Mannheim. The city of Mannheim MVV Energie indirectly holds 50.1%.

MVV Umwelt GmbH, a subsidiary of MVV Energie AG, currently operates at five locations in Germany, waste incinerators and biomass power plants with a capacity 1.6 million tons, ranking it claims to third place in Germany. The company dumped the waste from 20 local authorities with around 3.7 million inhabitants.
http://www.mvv-umwelt.de/

MVV Energy announced in December 2008 for the 12 months previous sales of around 2.6 billion euros and an operating profit of 249 million euros. Previous year: 199 million euros.

We wonder whether Mannheim's Lord Mayor Dr. Peter Kurz, has the co-responsible for the PR dirt indirectly, 50.1 percent, is informed of the crude methods of MVV. Here he can be, or its officers for investment management Steffen Bremeier ask this:
Phone (office): 0621 293-9300 or 9302
Fax: 0621 293-9700
E-mail: peter.kurz @ mannheim.de
E-mail: steffen.bremeier @ mannheim. de
Phone: 0621 293-9307

One of the questions could be:
How does a 2-billion-Euro Group (current market capitalization of MVV) to demonize Mannheim using tax money, the MBA process of German SMEs?
Germany thrives on exports, but not at any price. Imagine, Audi, BMW, Mercedes, Porsche and Volkswsagen would spread in North America through its German competitors that that absolute in the home Are failures. Hard to imagine. Export may be made with decency and fair play.