Tuesday, December 15, 2009
Messages To Write In Wedding Cards
Last week it was made of the interior plaster finish. In my opinion to be working. However, the plasterers have to do outdoors still some things that they should make already done: The base is not yet fully insulated, the exterior window sills of the light trench and the patio door missing and the basement windows are not yet rendered. Supposedly they are working simultaneously on three construction sites (one in Darmstadt!). Well - was probably only a matter of time before the time pressure is growing.
For now, the plumbing under the leadership of Mr. Schlotzhauer from WMS-Home technology in the house and prepare the floor. On Thursday then come to the floor. The floor should be the first time with a flow temperature are heated by 25 degrees, so there is no frost damage. At the moment we have mild temperatures below freezing - but still go to the greens. In the children's
we have now but decided to leave the bath place directly on the concrete and not, as planned by the Deura: on the floor - reason: We think it's nice if the tub is higher than 50 cm - and that is only if it is directly on the concrete. For this we needed an extra form (disclaimer) sign, with which the Deura hedges (possibly occurring water damage - but it is rubbish!).
Subscribe to:
Post Comments (Atom)
0 comments:
Post a Comment