Thursday, December 17, 2009

Odyssey Buggies For Sale

Christmas break

So - the next few days resting a hand on the site. Just perfect for quiet time. Bauherrren, workmen and neighbors can look forward to Christmas.

At this point I would say that we are satisfied with the work done. In particular, the coordination of the service worked well - the house was plastered against frost finished and the floor is already in there.

Last week came the window manufacturer again to replace the wrong bars. In this context, the flaws have been examined to the frame. It has assured us that damage is removed and then no longer be seen. For this, the Holes with a wax type finish and burnished. Perfect!

Special credit also look at the plasterer from VL-plastering company who have really done a great job. Even our independent tile has praised their work. Similarly, great work was also part of the company WMS-house technology under the guidance of the Lord made Schlotzhauer. For the next few weeks we have a portable heater was provided free of charge. Only the resulting electricity costs we must bear.

Next week is still the staircase builders and takes the allowance as soon as the screed can be walked. Also next week is broken down the framework and our depth will be a farmer Mr. Schliep Part of the house near the land fill ever heard - all in the cold season and advanced - Top!

Musinex Dm And Rashes

The screed as a Christmas


living / dining area with joint


screed at the entrance

time for Christmas, came yesterday to the floating floor and was now filled. First in the floor, then on the ground and finally in the basement. Between the rooms were each placed a joint. Just as in a joint living / dining area in the extension of the wall between WT and hallway.

Now is the first house to about five days, so the floor can dry properly. Following is then a special heating protocol driven. After about two to three weeks, the surface of the floor will open with a grinding machine so that moisture can escape better.

Tuesday, December 15, 2009

Fight Cancer Inspirational Quotes

floor



was today installed the underfloor heating. A temporary heating system ensures that water now flows in the pipes with a temperature of about 20 degrees. This ensures that no frost damage occurs.

to the floor thus precludes any more. A heating protocol will make in the next five weeks that the flooring is best to dry out. Hopefully!

Sony Dvd Player Sr200p Avi

pics: plastering plastering and floor insulation and underfloor heating


hobby room: Supply and waste lines


kitchen


living / dining area: The lines disappear behind a dry wall. Here, we were all angry again. Actually, electrical conduits were left to lie on the red waste pipe so that the shaft is not too wide. Now we will tie up temporarily and we hope that the dry Bauer does a good job.


hallway and staircase with window to the living room


living room with a view of woman and car :-)

Messages To Write In Wedding Cards



Last week it was made of the interior plaster finish. In my opinion to be working. However, the plasterers have to do outdoors still some things that they should make already done: The base is not yet fully insulated, the exterior window sills of the light trench and the patio door missing and the basement windows are not yet rendered. Supposedly they are working simultaneously on three construction sites (one in Darmstadt!). Well - was probably only a matter of time before the time pressure is growing.

For now, the plumbing under the leadership of Mr. Schlotzhauer from WMS-Home technology in the house and prepare the floor. On Thursday then come to the floor. The floor should be the first time with a flow temperature are heated by 25 degrees, so there is no frost damage. At the moment we have mild temperatures below freezing - but still go to the greens. In the children's

we have now but decided to leave the bath place directly on the concrete and not, as planned by the Deura: on the floor - reason: We think it's nice if the tub is higher than 50 cm - and that is only if it is directly on the concrete. For this we needed an extra form (disclaimer) sign, with which the Deura hedges (possibly occurring water damage - but it is rubbish!).