Monday, September 28, 2009

Avx 7300 Pioneer Wire Harness Diagram

We have water in the house! The EC shall

... and that's good!

came on Friday the boys of fresh water Zweckverband Schwarzach group and have the water supply down.

The Bauwasserleitung was conducted as a precautionary measure up to the house, now converted into a fresh water connection and waterproof (up to a pressure of 0.5 bar inside and outside) in our utility room (for all "non-builders": utility room) is installed.

Silver And Black Angel Of Death Wig

contours


Praise to the company Lupo - until now the boys are really fast and make my opinion a good job. I try every day on site to look over, both to document everything and of course up close to the house construction to be present.

Last Thursday, 09/17/2009, was taken up the screen where you can see the first walls of our EC. The bottom row was built in mortar. All other rows are glued. This is much faster and uses much less water.
result, the house can also dry out much faster.

far we've really lucky with the weather - always hot and no rain!

After the ground slowly taking shape, and we are running around in it ever comes to us from all real super small - but that's probably normal :-)
Schliep The company that makes our earth works, does a great job. The trench was compacted in layers (approximately every 50 cm) and several times per shift.

Putting Peroxide On Herpes

Drainage of the light wells and retaining walls


After our basement was finished to our satisfaction and the outer walls were sealed with perimeter insulation, are now the light wells and light well was connected to a drainage system. The light wells in the north were connected to slotted pipes, so that the rising ground water can penetrate and drain away the same. In the south, the Skylights directly KG pipes connected and then introduced into our cistern.


A little tip to all clients: In the entrance area and in the area of the proposed terrace I had my share of heavy concrete retaining walls, which rest on the raised ground and about 180 cm high. They are used to the front steps and the northern part of the terrace in the first few years with the fall compacted earth and I can continue to have no trouble with it. In the patio area only at the house, because the design later in the south on natural soil is not there and will sink. The tip I got from my father, his house built about 30 years and has even supported us in word and deed. Thank you!

Friday, September 18, 2009

TrĂ­pode Manfroto 344b

The cellar is!


on Thursday, was 17:09., Then delivered the ceiling. Mr. Schwarz from the electric company black out Altdorf has moved directly after the conduits for electrical installations. Then the exterior basement walls were filled with concrete and poured the ceiling.

Davicon Cnet Cn200 Pro

The WU-Keller


The next day, then came even the exterior basement walls (waterproof concrete) and were from Lupo professional installation. Joint panels were installed and the transitions with a sealant filled.