Friday, September 18, 2009

TrĂ­pode Manfroto 344b

The cellar is!


on Thursday, was 17:09., Then delivered the ceiling. Mr. Schwarz from the electric company black out Altdorf has moved directly after the conduits for electrical installations. Then the exterior basement walls were filled with concrete and poured the ceiling.

Davicon Cnet Cn200 Pro

The WU-Keller


The next day, then came even the exterior basement walls (waterproof concrete) and were from Lupo professional installation. Joint panels were installed and the transitions with a sealant filled.