
on Thursday, was 17:09., Then delivered the ceiling. Mr. Schwarz from the electric company black out Altdorf has moved directly after the conduits for electrical installations. Then the exterior basement walls were filled with concrete and poured the ceiling.
0 comments:
Post a Comment