Wednesday, June 30, 2010

Pitting Pedal Edema High Blood Pressure

current status - both inside and outside

status inside:

In recent weeks, not so much done - little time - and the air was out, too. We have done some other things inside, such as built a Küchenabhängung to hide the pipe of the hood, some cables are installed properly secured furniture and finally installed all the lights. On the part of the Deura There are a few points open. We had early March, when we moved in, building inspection official, but we had a few minor points put on the list of deficiencies. A few things were done promptly, otherwise we are still waiting, because the production takes so long (eg, replacing a window pane) or because of the craftsmen at a later date is in the area and is building the other half of the double house. Since there really are just little things that stand no further, this is also ok for us - has been denied. For a few minor flaws and more beauty stories that you can repair the bad, we get from the Deura a credit. If we find very fair. For example, are added to some marble window sills a few scratches or a window a small scratch.

Status outside:

have started with the outdoor facilities. The light well, we have built themselves. 2 days sweaty Work. A granite stone weighs about 35 kg.

The other work we have passed to the garden and landscape designers Linhart. Currently it looks messy - have a huge pile of dirt in his face. Let the carport and the way Excavating and compress with mineral concrete. There are also equated discounts. L itself is later paved stones at the property line and ground for the carport and the shed, we can also set and prepare the concrete with mineral terrace. Make like a pedestal for the front door - even granite. The land model with soil, we will then take over. Lawn and patio come a little later. One step at a time. Are happy in any event that something does - the whole mess has already annoyed (us - Tim does not find it great to dig in the ground and climb around in excavators) - and now we at least come clean shoes in the house. So far we are happy with the guys from Mr. Linhart. Look mer times as it goes. make really done before we can only begin when the outdoor facilities of the neighboring property, so the match ups. Between our land is right at home, so the terrace, a 4 m long wall as a screen, which then turns into a 60 cm high wall of granite blocks - the same stones as our light trench. So you have a clear view, feels not so restricted and can share, in places, bushes. Everything should happen in August.

a carport in galvanized steel and glass and stainless steel canopy for the front door we can manufacture at present by the company from Hoehne Burgbernheim. Very good advice! Can we also highly recommended. The things to be installed in about 5 weeks. Are excited.

Recent photos of the outside space:



carport area 6 excavated x 7 m and subbase provided



our way - wide 1,20 m, granite borders, L-stones on the land border because of the high ground level



The entrance



path or future small lawn behind the house



path behind the house with foundation for garden shed (under here)



Eingangsbereicht granite



terrace area (8 x 4 m) compacted concrete with mineral + cistern