Thursday, December 17, 2009

Odyssey Buggies For Sale

Christmas break

So - the next few days resting a hand on the site. Just perfect for quiet time. Bauherrren, workmen and neighbors can look forward to Christmas.

At this point I would say that we are satisfied with the work done. In particular, the coordination of the service worked well - the house was plastered against frost finished and the floor is already in there.

Last week came the window manufacturer again to replace the wrong bars. In this context, the flaws have been examined to the frame. It has assured us that damage is removed and then no longer be seen. For this, the Holes with a wax type finish and burnished. Perfect!

Special credit also look at the plasterer from VL-plastering company who have really done a great job. Even our independent tile has praised their work. Similarly, great work was also part of the company WMS-house technology under the guidance of the Lord made Schlotzhauer. For the next few weeks we have a portable heater was provided free of charge. Only the resulting electricity costs we must bear.

Next week is still the staircase builders and takes the allowance as soon as the screed can be walked. Also next week is broken down the framework and our depth will be a farmer Mr. Schliep Part of the house near the land fill ever heard - all in the cold season and advanced - Top!

Musinex Dm And Rashes

The screed as a Christmas


living / dining area with joint


screed at the entrance

time for Christmas, came yesterday to the floating floor and was now filled. First in the floor, then on the ground and finally in the basement. Between the rooms were each placed a joint. Just as in a joint living / dining area in the extension of the wall between WT and hallway.

Now is the first house to about five days, so the floor can dry properly. Following is then a special heating protocol driven. After about two to three weeks, the surface of the floor will open with a grinding machine so that moisture can escape better.