corpses pile up in the basement Horstmann
corpses pile up in the Horstmann-Keller
Chemnitzer pellets stink
Brandenburg ball mill exploded
Petting in the Lahn-Dill-Kreis
Horstmann recycling technology was established in 1956, worked his way from coal conveyor belts on waste sorting to the MBA Bauer high and "one g for 2 . May 2007 to the provisional administrator Dr. Hartmut rod from Bielefeld. The company has 440 employees located in Bad Oeynhausen, Leipzig, Germany and Poland, and was last approximately EUR 80 million in annual sales. 2006 led to liquidity problems because of two larger objects. On 23 March 2007 broke the previous contractor and construction partners Horstmann projects Günter Karl Eggermann (Eggermann Group / Fechtelkord & Eggermann GmbH) problems by buying Horstmann. He expected a net loss of EUR 3 million and put money in g "significant amount available, he said.
the end of a ten-week withdrawal period Eggermann got cold feet after he cast a glance in the Horstmann-Keller. There are dead bodies piled in "significant double-digit millions g. So anywhere from 10 to 99 million EUR. Eggermann speaks of an economic disaster for Horstmann and presented for Horstmann GmbH & Co. KG bankruptcy. Compared to media, he suggests that the original (cheap) Appraisals under pressure from banks was created. Only with the development of specific recovery plan was the truth. The banks have made then sealed. Nothing really new. Banks offer loans to prefer it if you do not need it. It also shows that some banks do not really have a clue of MBA.
Eggermann and Horstmann had to set up then 10 MBA with a total of around 180 million euros, according to the press, including in Ennigerloh (we reported on the fire), Holy Wood, Minden, Rosenow and Rostock and Wiefels. 2004 asked the MBA Wiefels at Wilhelmshaven is expected to be one of the great bodies. It has a half years delay, only one third their planned capacity and speed. Bad luck and margins have accompanied the project. The biggest problem is said to be the fiber materials in the garbage and put the fermentation always lame. To the MBA to keep trouble-free would have to possibly greater amounts of these substances are filtered out mechanically from the tailings, writes the "Walkman" (see below).
An old mishap of the wet mixed waste digestion or individual fractions of it, we mean. The mush attracts high biogas yield, but sometimes clogged the system. Whether the fibers are really the only problem remains to be seen. Finally, wet inert materials are separated, the dewatered will have. When pressing of inert, it has already been a lot of breakage, it is known in the industry.
The purpose Wiefels Association Waste Management Centre is still confident the plant will now build on their own end. The budget of 21 million euro is to be respected. EUR 17.5 million have been already paid EUR 3.1 million are still in the box office.
the construction of a sorting plant in Innsbruck Ahrental Horstmann is primarily responsible for the engineering. The client, however, indicate the percentage as low anyway and are optimistic for completion. From June 2007
should Horstmann actually in Turkmenistan with the assembly of a mixed waste composting, with approximately 250,000 begin tpy capacity, was announced in January 2007. Export successes have also been reported for Turkey and Spain. What the outcome is unclear. The website
www.horstmann-group.com
is still largely in place.
http://www.fe.de/news_presse.php?action=viewNews&news_id=21
http://www.vlothoer-anzeiger.de/va/lokales/bad_oeynhausen/?sid=4f872ead11ae2096af46a31034512eb5&cnt = 1562076
http://www.nwzonline.de/index_regionalausgaben_artikel.php?WZRessort=yMCRpLSrjbq8lZif&C=0&id=1306848
http://www.nwzonline.de/index_aktuelles_artikel.php?Ressort=&C=0 & ; id = 1308125
http://www.tirol.com/wirtschaft/innsbruck/61656/index.do
http://www.nwzonline.de/index_aktuelles_artikel.php?Ressort=&C=0&id=1327011
www.streitboerger.de / Attorneys / har_sta.html
In Chemnitz is still waste in bales stockpiled and stinks. The waste treatment plant with crushing, sorting, superheated steam drying and pelleting of the White Way had initially technical difficulties, the "Free Press wrote on 4 g May 2007. Since it was 7000 t. Which are now being processed, said the Waste Management Association Chemnitz. Since the pellets smell from the plant is for she later this year, a silo to be built. Horstmann has provided for the system, the screening and conveying technology.
In the complex recycling Brandenburg Park, the mechanically produced from household and industrial waste derived fuel pellets, it was on 5 May 2007 a major fire. In a ball mill for grinding of household waste is said to have been an explosion. Through the dust in the recycling hall is a large explosion followed. One person was seriously injured.
http://www.havelstadt-brandenburg.de/New/index.php?option=com_content&task=view&id=2626&Itemid=166
in Hessen Lahn-Dill-Kreis is smooching openly and publicly. The aim of the affirmations of love "yellow bag" is. Citizens should still use him pray, in order to reduce the residual waste in the MBA Aßlar. How bad is it (we reported on several occasions) for the MBA? District Wolfgang Schuster is not tired. On 1 December 2006
http://www.lahn-dill-kreis.de/presse/ldk_presse_artikel_38776.html
he made a proclamation in May 2007, he already asked twice to participate
http://www.lahn- dill-kreis.de/presse/ldk_presse_artikel_44284.html
http://www.lahn-dill-kreis.de/presse/ldk_presse_artikel_44488.html
Until the District election in November 2006 was the Lahn-Dill-Kreis declared DSD opponents. Ex-Administrator Dr. Karl Ihmels used the hostility for years.
http://www.lahn-dill-kreis.de/presse/ldk_presse_artikel_37857.html
Normally DSD paid good money for advertising campaigns. If anyone here sponsored? Whether it can re-educate the county residents as quickly remains to be seen.
sources
Fechtelkord & Egger man presented some newspaper reports on its website, including from the "Neue Westfälische Zeitung of 4 g May 2007
http://www.fe.de/news_presse.php?action=viewNews&news_id=21
"Insolvency and Withdrawal the purchase agreement
Marienfeld / Bad Oeynhausen (aes). Of an "optimal cooperation in the field of waste g was talk, announced as the Marienfelder group Eggermann end of March, the takeover of the Bad Oeynhausen recycling specialists Horstmann GmbH & Co. KG. Now, the once celebrated business purchase will prove as a blow to the office.
As CEO and the Horstmann GmbH Karl Günter Eggermann made on Wednesday for bankruptcy for the acquired company and is literally at the last minute also resigned from the purchase contract for the shares. Attaches Eggermann the finding that the other companies within its group were of the Horstmann-bankruptcy "does not affect g. Eggermann will the contractual obligations "as usual to meet g. Neither projects have commercial relations are" at risk in any way g.
administrator Dr. Hartmut rod (Bielefeld), he will, Eggermann, "with all your might be available to for a way to debt relief and continuing the company looking to g.
The company, founded in 1956 Horstmann employs 440 people at three locations in Bad Oeynhausen (240), Leipzig, Germany and Poland and, recently generated 80 million euros in annual sales. The company is a market leader in the field of recycling technology. Major projects, there are also international, as currently in Turkey, Spain and Turkmenistan. Only in 2006, Horstmann was run into liquidity problems, which seemed solved by the acquisition by Eggermann - especially as the financing banks g due to a "going concern prediction supported the company store.
But it was different. As a reason for the surprising back down Karl Günter Eggermann called yesterday the unexpectedly poor financial situation of the Horstmann GmbH In developing an economic recovery plan had been found only after the contract signing that before the takeover Horstmann's under pressure from a consortium of banks determined numbers of a Economic and business consulting company "the true extent of the economic disaster does not begin to reflect g. During whether in the opinion still been a net loss of at least three million euros the speech, must now" be expected from a loss in significant double-digit millions g. By Eggermann been provided - and unspecified figured - sums were "by far the g not been sufficient to continue operations. The Horstmann financing banks were no longer willing to keep up on the acquisition of existing shares lending.
before now failed takeover Horstmann GmbH and had to Eggermann Group, the Construction & Fechtelkord Eggermann GmbH ten o'clock mechanical-biological waste disposal systems with a total of around 180 million € built, among other things Ennigerloh, Osterholz, Minden, Rosenow and Rostock. Horstmann was responsible for systems engineering, Fechtelkord & Eggermann for the works.
Both companies acquired during this time a good reputation in the waste management industry. By pooling the expertise of both companies wanted to improve Günter Karl Eggermann the market situation for his entire group. There was even an expansion of jobs, the speech - which has now done well.
Unstable: So far, Loher were allowed to be proud of the support technicians Horstmann. But meantime's seems clear that the old-established companies "significant double-digit millions g (Eggermann) is in debt.
(Source: Neue Westfälische Zeitung) "
The" g Vlothoer Gazette wrote on 5 May 2007
http://www.vlothoer-anzeiger.de/va/lokales/bad_oeynhausen/?sid=4f872ead11ae2096af46a31034512eb5&cnt = 1562076
"Horstmann is facing insolvency
Eggermann runs surprisingly back / tan 240 employees in affected
Bad Oeynhausen (va). With effect from 23 March 2007, taken over the group Eggermann from Marienfeld (Kreis Gütersloh) the Bad Oeynhausen traditional business Horstmann. Through the acquisition of agency for recycling facilities would Managing Director Karl Günter Eggermann strengthen the market position of the business in the waste area.
By Peter Steinert
Now, just exactly ten weeks later, pulls back Eggermann surprising and sends Horstmann with its 240 employees at its headquarters Loher into insolvency. As the court in Bielefeld, now confirmed, the Bielefeld Dr. Hartmut rod lawyer has been appointed as provisional liquidator.
The completely surprised staff learned on Wednesday from the changes. According to this Eggermann pulled the ripcord at the last minute and have made a valid assumption to 12 clock-cancellation clause. Parallel to this was the company boss in his capacity as managing director for Horstmann GmbH & Co. KG on 2 May the bankruptcy application is filed.
The group Eggermann refers in its statement of reasons for an opinion, which had reported a 2006 net loss of nearly three million euros. In a now widely used press release states that "must be based on a loss in significant double-digit millions After examining the numbers."
built from 2002 to date, by Horstmann and the company Fechtelkord & Eggermann ten o'clock mechanical-biological waste disposal systems for a total of about 180 million euros. Here Horstmann recorded each responsible for systems engineering, while Fechtelkord & Eggermann provided the necessary construction work.
2006 came Horstmann liquidity problems. The company had focused on new technologies and had fallen to two larger objects in the imbalance. Manager Udo Sunderbrink confirmed in March the "financial difficulties". What to request of a consortium of banks from an external economic and management consulting firm a report has been prepared, which came to a positive continuation forecast. Since Horstmann on its own was not able to solve the economic problems, Karl Günter Eggermann acquired in March Horstmann all business units. Were used as basis "the positive opinion and the intention of the banks, Eggermann in continuing the company's support."
Eggermann in turn went in and made financial advances to the Bad Oeynhausen "significant amounts of liquidity available." In standstill advised projects were pushed back, at the construction sites could be re-worked after a short time. In parallel, a specific recovery plan prepared. The Eggermann press office explained: "It was found that the experts determined figures represent the scope of economic disaster does not begin to reflect." Ultimately, the
ranged from Eggermann not to secure liquidity amounts made available to continue the business. Eggermann, "The company Horstmann GmbH & Co. KG financing banks are now no longer prepared to keep up on the acquisition of existing shares credit and Avalvolumen."
from the blaze was yet to receive even an opinion. Horstmann manager Udo Sunderbrink had already Thursday afternoon no response to a request to adopt next Monday. "
The Neue Westfälische Zeitung wrote on 25 May 2007
http://www.nwzonline.de/index_aktuelles_artikel.php?Ressort=&C=0&id=1327011
'Association will meet on its own crisis
WASTE DISPOSAL WASTE PLANT IS BY HORST MANN-PLEITE READY BUILT IN SELF-DIRECTED BE - "NO ALTERNATIVE g
Jever - shows the waste disposal association, is optimistic. By the end of May, he must convince the Ministry of Environment of its concept. is
By Melanie Hanz and Klaus Homola
The Zweckverband Waste Management Centre Wiefels the mechanical-biological waste treatment plant (MBT) in-house build to an end. The budget of 21 million euro is to be respected. This was decided unanimously on Thursday, the association board. At the same time expressed the Assembly president, Lothar Arlinghaus their trust.
The purpose of association had come under pressure to act because the company has Horstmann, which should build the MBA in fact, filed for bankruptcy. One reason for this is ongoing technical difficulties. Although the facility was already running a half years ago under full load, it has achieved up to now only a third of their capacity. The result is that the waste will be stored and disposed of other means. This also has the Ministry of Environment the plan called - it requires a consistent approach, as the waste disposal association will get rid of this garbage.
until completion of the facility will ensure the purpose of the Association of garbage disposal via a network failure. Its capacity is also sufficient to vacate the interim storage.
"There are no alternatives g emphasized Friesland District Sven Ambrosy. For the MBA should not run until the end of the year, threatening the European tender for the disposal of 80 000 tonnes of waste a year. This step would be associated with significant increases in fees.
"We focus all our energy on bringing the system up and running g assured Association Chairman Dietrich Gabbey. The plant was protected under the bankruptcy from unauthorized access. Currently run an inventory to purchase urgently needed parts.
The biggest problem currently preparing even the fibers in by fermentation always lame. To the MBA to keep trouble-free, may have larger amounts of these substances are filtered out mechanically from the regular trash. This additional expenditure would not technical, however, reflected on the charges, said District Administrator Wittmund Henning Schulz: "The purpose of association has a rich cushion with which we could make up for the g, he said.
criticism came from association member Willi Lüpke. He complained that the purpose of organization development have not stopped earlier. "The facility is no longer pray healthy g, he said.
The deadline for the Environment Ministry demanded concept runs from late May. Overall, the meeting was optimistic that we can meet the conditions. "
It looks like rain. Perhaps there is a fire then less frequently. Schöne Pfingsten wishes
Henriette Franke
for author's collective waste-criticism
Friday, May 25, 2007
Monday, April 23, 2007
No Marks Good For Marks
waste in Rostock, Heilbronn, Book Ennigerloh, Ihlenberg
from readers page was suggested that we should have a positive report. we do.
The rat population in the vicinity of the MBA Rostock enjoys excellent health. The fact that the rodents are said to have complained about the smell of the plant, we consider an improbable rumor. Unfortunately, the deer is in the area not so good.
(see North German Latest news below).
http://www.svz.de/nnn/newsnnn/NNNVermischtes/18.04.07/23-16801193/23-16801193.html
Investors of American private equity fund KKR - Kohlberg Kravis Roberts, it is probably good . The fact that the rodents, uh investors have not complained about the disappearance of 800 million euros from the DSD-checkout, we believe a credible rumor. Longer in a report by the magazine Capital, the Europe Online / Environmental call plays.
http://www.umweltruf.de/ticker/news_druck0.php3?nummer=1006
Ecowest The waste-management system Westfalen GmbH fix the fire damage to the MBA Ennigerloh. The rough treatment of the alternative fuel facility will be renewed, for 160,000 tons per year. It says so in the notice of April 2007, at the Remondis Lünen is involved. The MBA is
Ihlenberg between Luebeck and Rostock on 16 April is not burned, it was only the interim storage facility for household waste. The Ihlenberger Waste mbH - IAG - has indeed the police initially prevented from entering the property, but they later discover that let in (see Gadebusch-Rehna Newspaper below).
http://www.svz.de/newsmv/lr/gad/18.04.07/23-16801019/23-16801019.html
The MBA in Heilbronn Book and concluded not only due to odor. Even the "Geostabilat" which was produced there, was poor. The ISKA process had worked as a pilot plant, no longer in larger dimension. The plants were immediately started under full load. Common is a several month trial run.
(see Heilbronner Stimme below)
http://stimme.de/nachrichten/landkreis-heilbronn/art1923, 990424.html? FCMS = b5dc65949912a8e209ea73895752d13c
article in the Norddeutsche Neueste Nachrichten on 18 April 2007
"Dying Deer on plastic waste?
dead deer hunters observe increased / no info at Veterinary
Rostock (Nadine Schuldt) Watch • The opening of the waste treatment plant in the overseas port-deer hunter an increased death. Odor near the hall and increased rat infestation annoy the citizens as well. The construction of a waste incineration plant could increase the anger. The hunter Reinhard Weber run on his journeys from the wooded area "on the Schwienskuhlen" to his apartment for months increased rat front of my car. "In the past I have seen just a raccoon or a fox," said the forester responsible hunting ground for the two. He leads the increased occurrence of the rodents on the commissioning of the waste treatment plant back to their areas of waste incineration and mechanical-biological treatment (MVA and MBA) in the overseas port.
His observations go further still. "When dead deer we cut the stomach and film remains found," said the forester. In his eyes, could the wind blow during loading of the radicals over the plastic waste in the adjacent forest. The folded into balls plastic waste will be nibbled by deer. As ruminants, deer die painfully in it. His colleagues had also been seen dead animals.
Reports of dead deer are not received by the appropriate authorities. "Would people reported dead animals, then we would hold them," Dieter Hoffmann, Head of the use of animal rescue group said the fire service. The veterinary office has also received no information. "From the dead deer in our area is not known," said veterinary office manager Steffen Zander. In his eyes, had the company responsible - in this case, the waste-recycling company (EDC) - ready before starting up a concept for pest control have. With the construction of an incinerator in the amount of waste residues almost . Redouble The already existing odor could then exceed allowed limits. "When you sit right on the edge of the forest, it smells pretty strong," says forester hunters. According to the EDC is the recycled garbage "in the border area of the design capacity of the biological stage. In an extension, it also means the EDC in an amendment to the Federal Pollution Control Act, compliance with the limits is given according to the Waste Disposal Ordinance. "
http://www.svz.de/nnn/newsnnn/NNNVermischtes/18.04.07/23 -16801193/23-16801193.htmlhttp: / / www.svz.de/nnn/newsnnn/NNNVermischtes/18.04.07/23-16801193/23-16801193.html
article in the newspaper of 18 Gadebusch-Rehna April 2007
"fright in the night: fire on the Ihlenberg
household waste interim storage through autoignition
North West Mecklenburg (Volker Bohlmann) • A fire burned in the landfill Ihlenberg at Selmsdorf held in the night yesterday, three firefighters in breathing. According to the Waste Ihlenberger mbH mounted between household waste fell by spontaneous combustion fire. Frenzy of activity on the Ihlenberg. On the night of Monday to Tuesday where household waste fell into an intermediate store on fire. According to Katrina Hase, Assistant Vice President of IAG Ihlenberg Waste mbH, the fire started about 20 minutes before midnight. A few minutes later came the company's own fire brigades. Although it is predicted by the IAG is a "surface fire" acted, moved yesterday from the clock to 1 Selmsdorf military and against the clock 1.40 Teschow firefighters to the site. "Through the coordinated interaction of all the forces of the fire was quickly brought under control," says Hare.
for speculation caused the message that two police officers were not allowed in the situation despite the danger area of the IAG and the military Teschow without siren went to the site. Upon request, the editorial team confirmed Steffi Nietz, spokesperson of the Police Department Schwerin, both messages. Opposite the SVZ assured Katrina Hase, that there was nothing to hide. There were only precautionary measures: "A danger to people did not exist. Our laboratory has carried out a gas measurement. "The fact that the officials had to wait at the gate, had something to do with the need for security. After completion of the coordination measures could the police take a picture of the situation on the ground. "To our knowledge, there was a small-scale fire," said police spokeswoman also Nietz.
the view of the IAG may occur in certain weather conditions for spontaneous combustion of waste. In the latest case, it is said to have acted out of household waste. "The Workup of these stocks prior to commissioning of the MBT (mechanical biological system) is imminent, "said Hare. Subsequently, the storage of waste materials is on the Ihlenberg.Aus view of the IAG may occur in certain weather conditions for spontaneous combustion of waste. In the latest case, it is said to have acted out of household waste. "The processing of these stockpiles from before commissioning of the MBT (mechanical biological system) is imminent," said Hare. Subsequently, the storage of waste materials is on the Ihlenberg. "
http://www.svz.de/newsmv/lr/gad/18.04.07/23-16801019/23-16801019.html
article in the Heilbronner Stimme of 18 April 2007
"Waste Disposal: EnBW is open to their contracts
By Herbert Kaletta
Clear commitments and yet many questions. This is the situation in the future refuse collection and disposal in the city and district Heilbronn. Environment Committee of the County Council Heilbronner now representative of EnBW informed about the structure of waste disposal, after the company part of its Environment Division (U-Plus) sold and include the bio-mechanical waste treatment facilities ISKA-in Heilbronn Book is.
your biggest concern, the issue of contract certainty seem District Detlef Piepenburg and the district councils to be rid of. The Alba AG, Berlin, Germany, third largest waste management will take over the obligations since then ten in the garbage disposal, said the district councils Manfred Haber notes, Corporate Representative of EnBW. remains for the disposal of the collected waste for which the not for sale, EnBW's subsidiary T-plus charge, EnBW has given the district a written guarantee.
EnBW had several years ago awarded the contract for the management, and bought out the city of Heilbronn, the county and the Hohenlohe practically already concluded contracts with the MVA Mannheim. Also has a clear commitment to the Heilbronn district office that the county by the changes no additional cost . Arise
"Two things are left," reported District Detlef Piepenburg. First, it left a bitter taste that the proposed disposal route is not gone. Secondly, one would have wished a better information policy. So the circle was well aware of the first councils in the meeting that the closure is due to the ISKA systems not only on the fact that the odor was not under control (as reported). As Dr. Gerd Uhlenbrauck, CEO of T-Plus and EnBW Group Representative for the management pointed out, and got the system also limits the Geostabilat can not keep that one in the bio-mechanical wanted to win ISKA system. As a pilot plant ISKA have does not work in larger scale.
Manfred Haber paper acknowledged that it was "a mistake" to abandon the plants just below full load, which had also taken personal consequences. Finally we gave up the project ISKA, because even high levels of investment in improvements could guarantee a solution to the problems. County Council Paul Gräßle (Green) spoke of a "lost opportunity", Hans Peter Peace of the SPD from the fact that the closure had "put at least the end of the odor nuisance to Heilbronn and Neckarsulm citizens. Christoph Schulz (CDU) fear However, despite neutrality guaranteed price for the county that "the citizens but somehow even pay the bill for economic disaster."
For the future, the EBW is clear on waste incineration. Currently, the waste from the city and county of Heilbronn, in the incineration plants to Stuttgart and Mannheim. But he was moved even to North Rhine-Westphalia. The Ministry of Environment requires that capacity in Baden-Wuerttemberg must be used before dodging in other states. But so much spare capacity is as necessary to accommodate the failures of the plants in Heilbronn and Book does not exist. Where the waste is stored, how is it transported?
unanswered questions. By the end of June, was "probably created the overall concept," said Uhlenbrauck on demand from the district administrator. Sure, the vehicles that collect the garbage, will not drive him to the incinerators. It takes one or more hubs. "We are negotiating with three vendors," said Uhlenbrauck, was also to demand our paper neither name nor elicit places. Also, the current ISKA site could be the location for a hub. Uhlenbrauck stressed that they would avoid conflicts due to odor problems. Also why he is against waste shipments Neckar ships. Until these are fully loaded, it would be contrary to waste several days around. The responsibility for that he would not accept.
KEYWORD
garbage
since 2006 leaves the company tens district Heilbronn the garbage. Ten is part of the EnBW subsidiary U-Plus, which will be sold to the Alba Berlin AG, the third largest waste disposal companies in Germany. Alba, says the EnBW, would take over the Treaty of tens. Runs until 31 December of 2014.
waste disposal
When disposing of the waste collected remains in the game because this task EnBW retains its subsidiary T-Plus, which is not for sale. EnBW has the district in writing and compliance with the contract, the 31 December 2015 completed. The waste is burned in EnBW's own and other plants. kal "
http://stimme.de/nachrichten/landkreis-heilbronn/art1923, 990424.html? FCMS = b5dc65949912a8e209ea73895752d13c
Kind regards Henriette Franke
author for collective waste-criticism
from readers page was suggested that we should have a positive report. we do.
The rat population in the vicinity of the MBA Rostock enjoys excellent health. The fact that the rodents are said to have complained about the smell of the plant, we consider an improbable rumor. Unfortunately, the deer is in the area not so good.
(see North German Latest news below).
http://www.svz.de/nnn/newsnnn/NNNVermischtes/18.04.07/23-16801193/23-16801193.html
Investors of American private equity fund KKR - Kohlberg Kravis Roberts, it is probably good . The fact that the rodents, uh investors have not complained about the disappearance of 800 million euros from the DSD-checkout, we believe a credible rumor. Longer in a report by the magazine Capital, the Europe Online / Environmental call plays.
http://www.umweltruf.de/ticker/news_druck0.php3?nummer=1006
Ecowest The waste-management system Westfalen GmbH fix the fire damage to the MBA Ennigerloh. The rough treatment of the alternative fuel facility will be renewed, for 160,000 tons per year. It says so in the notice of April 2007, at the Remondis Lünen is involved. The MBA is
Ihlenberg between Luebeck and Rostock on 16 April is not burned, it was only the interim storage facility for household waste. The Ihlenberger Waste mbH - IAG - has indeed the police initially prevented from entering the property, but they later discover that let in (see Gadebusch-Rehna Newspaper below).
http://www.svz.de/newsmv/lr/gad/18.04.07/23-16801019/23-16801019.html
The MBA in Heilbronn Book and concluded not only due to odor. Even the "Geostabilat" which was produced there, was poor. The ISKA process had worked as a pilot plant, no longer in larger dimension. The plants were immediately started under full load. Common is a several month trial run.
(see Heilbronner Stimme below)
http://stimme.de/nachrichten/landkreis-heilbronn/art1923, 990424.html? FCMS = b5dc65949912a8e209ea73895752d13c
article in the Norddeutsche Neueste Nachrichten on 18 April 2007
"Dying Deer on plastic waste?
dead deer hunters observe increased / no info at Veterinary
Rostock (Nadine Schuldt) Watch • The opening of the waste treatment plant in the overseas port-deer hunter an increased death. Odor near the hall and increased rat infestation annoy the citizens as well. The construction of a waste incineration plant could increase the anger. The hunter Reinhard Weber run on his journeys from the wooded area "on the Schwienskuhlen" to his apartment for months increased rat front of my car. "In the past I have seen just a raccoon or a fox," said the forester responsible hunting ground for the two. He leads the increased occurrence of the rodents on the commissioning of the waste treatment plant back to their areas of waste incineration and mechanical-biological treatment (MVA and MBA) in the overseas port.
His observations go further still. "When dead deer we cut the stomach and film remains found," said the forester. In his eyes, could the wind blow during loading of the radicals over the plastic waste in the adjacent forest. The folded into balls plastic waste will be nibbled by deer. As ruminants, deer die painfully in it. His colleagues had also been seen dead animals.
Reports of dead deer are not received by the appropriate authorities. "Would people reported dead animals, then we would hold them," Dieter Hoffmann, Head of the use of animal rescue group said the fire service. The veterinary office has also received no information. "From the dead deer in our area is not known," said veterinary office manager Steffen Zander. In his eyes, had the company responsible - in this case, the waste-recycling company (EDC) - ready before starting up a concept for pest control have. With the construction of an incinerator in the amount of waste residues almost . Redouble The already existing odor could then exceed allowed limits. "When you sit right on the edge of the forest, it smells pretty strong," says forester hunters. According to the EDC is the recycled garbage "in the border area of the design capacity of the biological stage. In an extension, it also means the EDC in an amendment to the Federal Pollution Control Act, compliance with the limits is given according to the Waste Disposal Ordinance. "
http://www.svz.de/nnn/newsnnn/NNNVermischtes/18.04.07/23 -16801193/23-16801193.htmlhttp: / / www.svz.de/nnn/newsnnn/NNNVermischtes/18.04.07/23-16801193/23-16801193.html
article in the newspaper of 18 Gadebusch-Rehna April 2007
"fright in the night: fire on the Ihlenberg
household waste interim storage through autoignition
North West Mecklenburg (Volker Bohlmann) • A fire burned in the landfill Ihlenberg at Selmsdorf held in the night yesterday, three firefighters in breathing. According to the Waste Ihlenberger mbH mounted between household waste fell by spontaneous combustion fire. Frenzy of activity on the Ihlenberg. On the night of Monday to Tuesday where household waste fell into an intermediate store on fire. According to Katrina Hase, Assistant Vice President of IAG Ihlenberg Waste mbH, the fire started about 20 minutes before midnight. A few minutes later came the company's own fire brigades. Although it is predicted by the IAG is a "surface fire" acted, moved yesterday from the clock to 1 Selmsdorf military and against the clock 1.40 Teschow firefighters to the site. "Through the coordinated interaction of all the forces of the fire was quickly brought under control," says Hare.
for speculation caused the message that two police officers were not allowed in the situation despite the danger area of the IAG and the military Teschow without siren went to the site. Upon request, the editorial team confirmed Steffi Nietz, spokesperson of the Police Department Schwerin, both messages. Opposite the SVZ assured Katrina Hase, that there was nothing to hide. There were only precautionary measures: "A danger to people did not exist. Our laboratory has carried out a gas measurement. "The fact that the officials had to wait at the gate, had something to do with the need for security. After completion of the coordination measures could the police take a picture of the situation on the ground. "To our knowledge, there was a small-scale fire," said police spokeswoman also Nietz.
the view of the IAG may occur in certain weather conditions for spontaneous combustion of waste. In the latest case, it is said to have acted out of household waste. "The Workup of these stocks prior to commissioning of the MBT (mechanical biological system) is imminent, "said Hare. Subsequently, the storage of waste materials is on the Ihlenberg.Aus view of the IAG may occur in certain weather conditions for spontaneous combustion of waste. In the latest case, it is said to have acted out of household waste. "The processing of these stockpiles from before commissioning of the MBT (mechanical biological system) is imminent," said Hare. Subsequently, the storage of waste materials is on the Ihlenberg. "
http://www.svz.de/newsmv/lr/gad/18.04.07/23-16801019/23-16801019.html
article in the Heilbronner Stimme of 18 April 2007
"Waste Disposal: EnBW is open to their contracts
By Herbert Kaletta
Clear commitments and yet many questions. This is the situation in the future refuse collection and disposal in the city and district Heilbronn. Environment Committee of the County Council Heilbronner now representative of EnBW informed about the structure of waste disposal, after the company part of its Environment Division (U-Plus) sold and include the bio-mechanical waste treatment facilities ISKA-in Heilbronn Book is.
your biggest concern, the issue of contract certainty seem District Detlef Piepenburg and the district councils to be rid of. The Alba AG, Berlin, Germany, third largest waste management will take over the obligations since then ten in the garbage disposal, said the district councils Manfred Haber notes, Corporate Representative of EnBW. remains for the disposal of the collected waste for which the not for sale, EnBW's subsidiary T-plus charge, EnBW has given the district a written guarantee.
EnBW had several years ago awarded the contract for the management, and bought out the city of Heilbronn, the county and the Hohenlohe practically already concluded contracts with the MVA Mannheim. Also has a clear commitment to the Heilbronn district office that the county by the changes no additional cost . Arise
"Two things are left," reported District Detlef Piepenburg. First, it left a bitter taste that the proposed disposal route is not gone. Secondly, one would have wished a better information policy. So the circle was well aware of the first councils in the meeting that the closure is due to the ISKA systems not only on the fact that the odor was not under control (as reported). As Dr. Gerd Uhlenbrauck, CEO of T-Plus and EnBW Group Representative for the management pointed out, and got the system also limits the Geostabilat can not keep that one in the bio-mechanical wanted to win ISKA system. As a pilot plant ISKA have does not work in larger scale.
Manfred Haber paper acknowledged that it was "a mistake" to abandon the plants just below full load, which had also taken personal consequences. Finally we gave up the project ISKA, because even high levels of investment in improvements could guarantee a solution to the problems. County Council Paul Gräßle (Green) spoke of a "lost opportunity", Hans Peter Peace of the SPD from the fact that the closure had "put at least the end of the odor nuisance to Heilbronn and Neckarsulm citizens. Christoph Schulz (CDU) fear However, despite neutrality guaranteed price for the county that "the citizens but somehow even pay the bill for economic disaster."
For the future, the EBW is clear on waste incineration. Currently, the waste from the city and county of Heilbronn, in the incineration plants to Stuttgart and Mannheim. But he was moved even to North Rhine-Westphalia. The Ministry of Environment requires that capacity in Baden-Wuerttemberg must be used before dodging in other states. But so much spare capacity is as necessary to accommodate the failures of the plants in Heilbronn and Book does not exist. Where the waste is stored, how is it transported?
unanswered questions. By the end of June, was "probably created the overall concept," said Uhlenbrauck on demand from the district administrator. Sure, the vehicles that collect the garbage, will not drive him to the incinerators. It takes one or more hubs. "We are negotiating with three vendors," said Uhlenbrauck, was also to demand our paper neither name nor elicit places. Also, the current ISKA site could be the location for a hub. Uhlenbrauck stressed that they would avoid conflicts due to odor problems. Also why he is against waste shipments Neckar ships. Until these are fully loaded, it would be contrary to waste several days around. The responsibility for that he would not accept.
KEYWORD
garbage
since 2006 leaves the company tens district Heilbronn the garbage. Ten is part of the EnBW subsidiary U-Plus, which will be sold to the Alba Berlin AG, the third largest waste disposal companies in Germany. Alba, says the EnBW, would take over the Treaty of tens. Runs until 31 December of 2014.
waste disposal
When disposing of the waste collected remains in the game because this task EnBW retains its subsidiary T-Plus, which is not for sale. EnBW has the district in writing and compliance with the contract, the 31 December 2015 completed. The waste is burned in EnBW's own and other plants. kal "
http://stimme.de/nachrichten/landkreis-heilbronn/art1923, 990424.html? FCMS = b5dc65949912a8e209ea73895752d13c
Kind regards Henriette Franke
author for collective waste-criticism
Subscribe to:
Posts (Atom)