From drywall up stairs! Hi, I'm back. Now that I have not written anything for so long about our site, I will publish today all the more.
First, I wish all readers a happy new year!
After we brought the Christmas holiday rather lush behind us, we went to five days in Ansbach on the way home past the house and found with horror that the window at Tim's children is wide open. And the heater is running - great! Our future neighbor told me then that the window is open for five days. Investigations have shown that the screed Bauer had drawn the window from the outside and then had attached to the frame. The workers then have the scaffolding company in the degradation of the scaffold settled ignoranterweise the rope easily and if anyone know. Thank God, the screed taken no harm. However, in the said days, the already high cost of heating power (mobile heater to the circuit connected to the floor) still increased.
Just before Christmas I had agreed with the supervisor that the site should be cleaned up. This should have been handled by civil contractors. Lay everywhere around construction debris and waste residues. In the end, the developer has even cleaned up the site!
on 04/01/2010 I then started with my father, the drainage pipes that run in the basement at knee height, clad in drywall. The rest of the drywall night we can have any tiles from our tilers. I can recommend this work because it made it ugly pipes are covered and you have a nice rack.
on 07/01/2010 I got myself hired a grinding machine to grind the surface over the screed. On the surface formed during the curing of a so-called Sinderschicht, which must be opened to allow the tile adhesive to better connect with the screed. This work, I will not forget! It is similar to riding a rodeo animals - fortunately I quilting adventure at that time Mr. Seidl, plasterers from Thann castle, in the house who gave me the cellar plastered interior walls. He had experience with such a monster and I was admitted to the secret of grinding. High praise even for the good Verputzerarbeit!
on 11/01/2010 then the boys came from the dry (carpentry Gürtler from Thuringia, under the leadership of Mr. Rosenek) and have the roof sealed. Since the house was like a lot warmer! Feels Like 30 degrees. To work almost too warm. The drywall had been the way to advance a week earlier - why have they not done that, written in the stars. However, the guys have really done a top job! We
in the meantime had some difficulties in the form that has hobbled the coordination of individual trades by the construction manager something. A detailed mail and a clarifying phone call with the MD of Deura, Mr Lüttkopf has solved this problem then. Mr. Lüttkopf and staff from the Office Deura have flat out and causes a very short time all that is necessary. Great praise and thanks. Now it works again.
The missing windows have now been installed as well.
on 21.01.2010 was then carried out by Mr. Lüttkopf the blower-door test. Here, the house is checked for leaks. By over-and under pressure. We had a value of 1.1 and 1.3 and that although some points on the house are not baufortschrittbedingt tight - great result. As for my opinion about the artisans only confirmed - great job!
From 24.01. I then started with the priming of the walls. Oh yes - we have had to make an offer of a painter times. House underline including materials and labor: 5300 €. Since the decision was clear to me and my volunteers. I've already bought the material - about 500 € including primer, paint and painting tool.
From 25.01. Lorenz, the tiles from the company bucks, Burgoberbach started to tile our bathrooms. The man is an artist. Great work in short time. The contact we have of my father, who has not so long ago that the bathroom tiles can be new. As we look at the work. It's always good when you can get an idea beforehand of the quality.
Am 27.01. were the dry farmer then with their work (ceilings on upper and panellings in the bathrooms, on the ground and in the hobby room) ready and we could cancel. Thanks Peter! Thanks for your help Astrid priming.
Today, at 01.02. Mr. Bauer was proud of the steps from trendy stairs from Nordhausen and NiO has the stairs - he will be ready tomorrow. High praise - the company has met our desired color exactly. Moreover, the Lorenz Work included in the EC.